Chandrayaan-1

Launch: October 22, 2008             Site: Satish Dhavan Space Centre, Sriharikota

The objectives of the programme were:

  1. To develop and orbit a spacecraft around moon using an Indian-made launch vehicle.
  2. To prepare a three-dimensional atlas of both the near and the far side of the moon.
  3. Chemical and mineralogical mapping of the entire lunar surface.
  4. To study the impact of Moon Impact Probe on the surface of the moon as a fore-runner to future soft landing missions.

NASA’s Moon Mineralogy Mapper (M3) had on Chandrayaan-1 had detected water on the surface of moon. The mission was expected to last two years. However, the communication with the satellite was lost on 29 August 2009 and the mission was declared over. It lasted for 312 days and achieved 95 percent of its objectives.

Chandrayaan-1 was selected by the American Institute of Aeronautics and Astronautics (AIAA) as one of the recipients of its annual AIAA SPACE 2009 awards for contributions to space science and technology.

 

BPCS Notes brings Prelims and Mains programs for BPCS Prelims and BPCS Mains Exam preparation. Various Programs initiated by BPCS Notes are as follows:- For any doubt, Just leave us a Chat or Fill us a querry––

Hope we have satisfied your need for BPSC Prelims and Mains Preparation

Kindly review us to serve even better


BPSC Mains Test Series 2022

20 Quality mock tests and GS Mains Notes

Mains Test Series and Notes (With Evaluation and Skill Enhancement)

Mains Printed Notes (With COD)

Mains PDF Notes (Digital)


For Any Suggestion’s and Updates kindly Comments your doubts Here

Subscribe to BPSC Notes

Never Miss any BPSC important update!

Join 8,598 other subscribers
error: Content is protected !!