Infrastructure
1. The Government of India shall develop a new major port at Duggirajupatnam in the successor State of Andhra Pradesh to be completed in phases with Phase I by end-2018.
2. SAIL shall examine, within six months from the appointed day, the feasibility of establishing an integrated steel plant in Khammam district of the successor State of Telangana.
3. SAIL shall, within six months from the appointed day, examine the feasibility of establishing an integrated Steel Plant in YSR District of the successor State of Andhra Pradesh.
4. IOC or HPCL shall, within six months from the appointed day, examine the feasibility of establishing a greenfield crude oil refinery and petrochemical complex in the successor State of Andhra Pradesh and take an expeditious decision thereon.
5. The Government of India shall, within six months from the appointed day, examine the feasibility of establishing a Vizag-Chennai industrial corridor along the lines of Delhi-Mumbai Industrial Corridor and take within such period an expeditious decision thereon.
6. The Government of India shall, within six months from the appointed day, examine the feasibility of expanding the existing Visakhapatnam, Vijayawada and Tirupati airports to international standards and take an expeditious decision thereon.
7. NTPC shall establish a 4000 MW power facility in the successor State of Telangana after establishing necessary coal linkages.
8. Indian Railways shall, within six months from the appointed day, examine establishing a new railway zone in the successor State of Andhra Pradesh and take an expeditious decision thereon.
9. NHAI shall take necessary steps to improve road connectivity in the backward regions of the successor State of Telangana.
10. The Indian Railways shall, within six months from the appointed day, examine the feasibility of establishing a Rail Coach Factory in the successor State of Telangana and improve rail connectivity in the State and take an expeditious decision thereon,
11. The Central Government shall take measures to establish rapid rail and road connectivity from the new capital of the successor State of Andhra Pradesh to Heyderabad and other important cities of Telangana.
12. The Government of India shall examine the feasibility of Metro Rail facility in Vishakhapatnam and Vijayawada-Guntur-Tenali Metropolitan Urban Development Authority within period of one year from the appointed day and take an expeditious decision thereon.
Coal
1. Of the total equity of Singareni Collieries Company Ltd. (SCCL), 51% shall be with the Government of Telangana and 49% with the Government of India.
2. Existing coal linkages of SCCL shall continue without any change.
3. New linkages shall be allotted to the successor States as per the New Coal Distribution Policy by Government of India.
4. End use plants of the allocated coal blocks shall continue with coal from the block to be supplied in proportion to their respective capacities.
Oil and Gas
1. Allocation of natural gas will continue to be done as per the policies and guidelines issued by the Government of India from time to time.
2. The royalties payable on domestic onshore production of oil and gas shall accrue to the State in which such production takes place.
Power
1. Units of APGENCO shall be divided based on geographical location of power plants.
2. Existing Power Purchase Agreements (PPAs) with respective DISCOMS shall continue for both on-going projects and projects under construction.
3. The existing Andhra Pradesh Electricity Regulatory Commission (APERC) shall function as a joint regulatory body for a period not exceeding six months within which time separate SERCs will be formed in the successor States.
4. The existing State Load Despatch Centre (SLDC) shall function for both successor States for a period not exceeding two years within which time separate SLDC shall be set up shall function under the direct administration and control of the Southern RLDC at Bengaluru.